Australian Maxi Championship 2026
Sydney Harbour. Forecast window Sun, 6 Dec, 11:00 to Sun, 6 Dec, 17:00.
The global model and Ostro, side by side
Wind from a real Ostro run on this course. Drag the divider, play the hours, tap the water for the numbers.
Cabbage Tree Island Racedemoforecast for Sat 21 Nov 2026
In your account: only the races and detail levels you've bought; download GRIBs from here.
GRIB ↓Demo from a real Ostro run for the 21–22 Nov 2026 Cabbage Tree Island Race window (GFS start, 1 km). Not yet checked against observations. Forecasts are for racing and planning, not navigation safety decisions.
1. Level of detail
Finer grids show more of the land effects and take more computing.2. Starting models
Each one is a separate forecast, run side by side on its own machines.Model timetable
Times in the venue's time zone, with UTC underneath. Latest files need to be ready by Sun, 6 Dec, 10:00, an hour before the window starts. Booked ahead, your run starts the moment the global model is released, so files arrive at the time shown. Ordered later, it starts when you order and takes the time in the last column. Times are estimates until each model run is published.| Model | Delivery | Global model run | Global model released | Our files, if booked ahead | Ordered later |
|---|---|---|---|---|---|
| GFS | Evening before | Sat 00 UTC runSat, 5 Dec, 11:00 | Sat, 5 Dec, 15:00Sat 04:00 UTC | Sat, 5 Dec, 15:25Sat 04:25 UTC | about 25 minutes after you order |
| GFS | Latest before start | Sat 18 UTC runSun, 6 Dec, 05:00 | Sun, 6 Dec, 09:00Sat 22:00 UTC | Sun, 6 Dec, 09:23Sat 22:23 UTC | about 25 minutes after you order |
| ECMWF IFS (open data) | Evening before | Sat 00 UTC runSat, 5 Dec, 11:00 | Sat, 5 Dec, 18:30Sat 07:30 UTC | Sat, 5 Dec, 18:55Sat 07:55 UTC | about 25 minutes after you order |
| ECMWF IFS (open data) | Latest before start | Sat 12 UTC runSat, 5 Dec, 23:00 | Sun, 6 Dec, 06:30Sat 19:30 UTC | Sun, 6 Dec, 06:54Sat 19:54 UTC | about 25 minutes after you order |
3. When you want it
Each delivery is a separate run from a newer model run. Tick one or both.How each model sees Sydney Harbour
Not the wind: the land the wind has to get around. Slide from the global models down to our finest grid, and drag the line across the picture to compare.







Global models, 25 km
Ostro, 333 m
2,304× the detail
Real terrain, not a forecast: satellite elevation data averaged onto each grid. A square counts as land when more than half of it is land, and each square gets one height. The whole view is drawn at one spacing so you can compare; in a run, our finest grid covers the dashed box, with coarser grids around it. Each forecasting centre's own land map differs in detail. Elevation: Copernicus DEM, © DLR and Airbus, provided by the EU and ESA.